Data center infrastructure construction

Data center construction according to your needs

To operate reliably and efficiently, the digital world needs data centers. These centers store and process large amounts of data, making uninterrupted and sufficient energy supply and security crucial for their operational reliability. We offer comprehensive and professional services for data center construction, starting from design, design management, and project management.

Our services cover the professional infrastructure construction of data centers according to the customer’s needs. We also implement the surrounding infrastructure of the data center, such as roads, power grids, and substations. We utilize digital solutions and the latest technology, and we manage the entire chain of construction using data model-based production.

We have experience and expertise in demanding data center infrastructure construction and working with international operators. Destia is part of the globally operating Bouygues Group, which brings international expertise to our projects. We also use FIDIC contract terms in our projects.

Destia is a builder of demanding and modern data center infrastructure – safely, responsibly, and reliably

Our services include, for example:

  • Project management
  • Design, design control, and implementation planning
  • Areal and road construction
  • Pre-construction
  • Foundations & pipes
  • Data center substations and power distribution network
  • 110 & 400 kilovolt cabling
  • Design and implementation of power supply systems
  • Industrial construction and small buildings

Project Management

Our solid expertise in executing and scheduling large and demanding infrastructure projects provides the basis for successful project management. We invest in project development by introducing new technologies and know-how to our production processes. Safety and responsible operating methods are key to all of our operations, and we take them into account throughout the project.

Design

Our expertise covers road engineering, electrical engineering, ground surveys and assessments of the existing roads. We carry out the necessary surveys and measurements using the latest technology. We also provide support for the challenges of the project development phase from preliminary studies to environmental impact assessment applications (EIA). Thanks to our engineering expertise, we are able to flexibly update and create plans flexibly and create new ones as required.

Field engineering and road construction

We implement road and street projects of different sizes from small local projects to large projects requiring special expertise. In addition, our state-of-the-art traffic control services ensure the safe and smooth flow of traffic on and around the site.

Pre-construction

We implement professionally pre-construction works for the needs of data centers. Our areas of expertise include all types of foundation engineering and rock construction, as well as earthworks. In addition, we also offer geotechnical design and water management.

Cabling and electrification

We are experts in electrification and ensure that the data center receives the necessary energy efficiently. We provide electrification services for the entire life cycle from preliminary studies and design to construction, maintenance, and, if necessary, follow-up inspections.

Industrial Construction and Small Buildings

We provide a wide range of industrial construction services, such as on site-cast construction, foundations, building construction, HVAC works, and surface structures. We implement various auxiliary facilities and buildings for the needs of data centers, for example for security, civil defense, maintenance and upkeep.

Responsibility is at the core of our projects

We build Finnish society by taking responsibility for people, the environment, and society. Responsibility work is a key part of our strategy and everything we do. In addition to ourselves, we also require our partners to work responsibly.

We enable our customers to achieve their responsibility goals through our sustainable services. We professionally carry out LCA emission calculations covering the entire lifecycle of the project and provide various sustainable services and solutions according to the needs of the project.

Data centres are built on a high-quality foundation

The more we use various online services, such as AI, social media or streaming services, the more data centres are needed around the world — and right now, the level of activity in data centre construction is higher than ever. A data centre project is a long-term effort in which the first yards are crucial; behind data centres springing up across the landscape, there is always a tremendous amount of preparatory work to ensure safe, high-quality and cost-efficient operations.

Interested? Contact us!

Tapio Leskinen

Director

Energy Networks

+358 40 120 9016

tapio.leskinen@destia.fi

Kalle Laine

Head of Sales & Marketing

+358405073219

kalle.laine@destia.fi